Archive for June, 2008
June 30, 2008
Article in the DJC
Posted by admin, 11:45 pm
June 30, 2008
A LEED platinum project, right in his [...]
June 30, 2008
Modern Green in Seattle
Posted by admin, 4:00 pm
One month to go. Interesting facade here, more edgy than the nearby structures. [...]
June 23, 2008
Stairs
Posted by admin, 2:12 pm
Stairs are now roughed-in for the final product. Here’s the architectural detail:
And before the [...]
June 20, 2008
Flooring install
Posted by admin, 1:52 pm
The flooring is being installed, as well as the casing, base trim and doors. [...]
June 19, 2008
Scuppers and metal Coping
Posted by admin, 6:07 am
The roof job leans commercial, in price, in build quality, and in look and feel. [...]
June 14, 2008
Walkscore 80 out of 100
Posted by admin, 3:41 pm
Check out Walkscore. It’s a tool to help you understand the “Walkability” of a [...]
June 12, 2008
ICFs Insulated Concrete Forms
Posted by admin, 8:48 pm
Here are some shots of the ICFs from the inside after completion. Note that these [...]
June 9, 2008
Planet Green – Renovation Nation
Posted by admin, 1:12 pm
About 6 months ago, the Discovery Channel came to my first LEED project in Seattle, [...]
June 6, 2008
Sheetrock
Posted by admin, 10:28 pm
It’s finish time. They say production builders can go from drywall to final inspection [...]
June 5, 2008
ICFs Insulated Concrete Forms
Posted by admin, 5:08 pm
A little out of sequence, but I wanted to share photos and my observations of [...]